Michael Barbulescu Re-Do

General details of the project

Glue/Tile/Wood Removal?
No
220V Power?
No
Cracks Present?
No
Scope of work

see original client page;
https://www.concrete-finishers.com/client/michael-barbulescu

Supplies Needed
metallic powder, flex paste, epoxy 450. Blow torch from the office!!! Fire extinguisher.
Foreman
Load General Tools
Task Description Task Notes Performed By Completion Date
Load Big Grinder(s)
Finish
Load Diamonds (Which Sets)
Finish
Load Ermator(s)
Finish
Hose(s) for Ermators & Wand
Finish
2 Ext. Chords + 2x per vac
Finish
Load Misc. Bin
Finish
Hand Grinder Bag(s) w/Racs
Finish
Load Micro-Fiber Head(s)
Finish
Extra Fan(s) ?
Finish
Water/Drinks for Crew
Finish
Repair Material in Truck?
Finish
Load Garbage Bags
Finish
Dolly?
Finish
plastic/poles/zipper kit
Finish
Security cam phone
Finish
Load Ram-Board/rosin
Finish
Spider box?
Finish
What else u load?
Finish
Load 220v Power Chords
Finish
Load radio
Finish
Load Grinder Bags
Anonymous 04-18-2018 12:59PM MDT
Load Masking Bag (fully inventoried)
Anonymous 04-18-2018 12:55PM MDT
Load Paint Bin (fully inventoried)
Anonymous 04-18-2018 12:55PM MDT
Load Stripping/Demo Bag
Finish
Load General Bag
Anonymous 04-18-2018 12:56PM MDT
Load Mop Bucket and wet grinder
Finish
Load Resinous Coatings Supplies
Task Description Task Notes Performed By Completion Date
Load Drill Bag (Drill w/Chord)
Anonymous 04-18-2018 12:57PM MDT
Load Mixing Tub
Anonymous 04-18-2018 12:57PM MDT
Load (3x) Spiked Shoes
Anonymous 04-18-2018 12:57PM MDT
Load Sanding Bin
Anonymous 04-18-2018 12:57PM MDT
Load (2) Swing Machines
Anonymous 04-18-2018 12:57PM MDT
Load Roller Bin (FULLY Inventoried)
Anonymous 04-18-2018 12:57PM MDT
Load Squeegee and Magic Trowel
Anonymous 04-18-2018 12:57PM MDT
Load Leaf Blower (if necessary)
Anonymous 04-18-2018 12:58PM MDT
Load extra 6 or 4 mil plastic
Anonymous 04-18-2018 12:58PM MDT
Load extra rosin paper
Anonymous 04-18-2018 12:58PM MDT
Load Ram Board
Anonymous 04-18-2018 12:58PM MDT
Load Carpet Section
Anonymous 04-18-2018 12:58PM MDT
Load mixing timers
Finish
load mixing pails
Finish
load extra drill paddles
Anonymous 04-18-2018 12:59PM MDT
load 3+ gals xylene
Anonymous 04-18-2018 12:59PM MDT
load extra cleaning microfibers
Anonymous 04-18-2018 12:59PM MDT
Load Vapor Barier Materials, Supplies, & Tools
Task Description Task Notes Performed By Completion Date
Load Extra Rollers
Anonymous 04-18-2018 12:59PM MDT
Load Vapor Barrier (A & B) (~110 sf/gal)
Finish
Load Vapor Barrier Color Packs 42:1 ratio
Finish
Unload Tools, Setup Jobsite, & Begin Work
Task Description Task Notes Performed By Completion Date
Everyone Clocked in/late
Finish
Take pictures
Finish
Show everyone Staging Areas
Finish
Discuss Security level & plan
Finish
Mask client area+setup 1-2 fans
Finish
List + discuss Timing Exp plan
Finish
Toolbox talk(safety, etc)
Finish
Do Jobsite damage inspection
Finish
Techs+foreman all Working
Finish
Done Color Samples (If appl.)
Finish
Done 1st cut edges (Grit)
Finish
Done 1st cut w/Big(Grit,wet/dry)
Finish
Corners Done & 2x Inspected
Finish
Done Vacuuming Floor
Finish
Begin repairs
Finish
Done with repairs
Finish
Mixing Station
Task Description Task Notes Performed By Completion Date
Mixing Station: 6 mil Plastic First
Finish
Rosin/Ram Board/Carpet over plastic
Finish
Ready (3x paintbrushes + small cups)
Finish
Ready 2x boxes gloves
Finish
Ready Spiked Shoes + Check for loose spikes
Finish
Ready Rollers + Delint them
Finish
Attach smallest mixing drill paddle for the container size
Finish
Remind people to remember timing exp. start/stop
Finish
Read Application Ins. in TDS outloud if ANYONE<5 jobs w/product
Finish
Setup Timing Experiment (note: conditions, # people, tools, etc.)
Finish
Ready Wooden Board + Garbage bags
Finish
Everyone put a rag in their pocket for spill cleanup
Finish
Prepare a tool cleaning station (bucket(s), solvent, rags, brush?)
Finish
Clean-Prep Floor
Task Description Task Notes Performed By Completion Date
Mask & Dam(Weatherstrip) areas that might get splashed/flooded
Finish
Inspect that floor is fully prepped/Sanded
Finish
Vacuum floor TWICE over (2 dif. people)
Finish
Windows open + Fans going for acetone scrub
Finish
Microfiber floor with small splashes of Acetone (DONT BLOW UP)
Finish
Inspect Jobsite cleanliness/masking/dams (who inspected)
Finish
Do a second walk through inspection (dams/masking/cleanliness)
Finish
Timing Experiments
Task Description Task Notes Performed By Completion Date
START Ex #1(tool,grit,sf,condition)
Finish
STOP/FINISH #1 (note: Successful?)
Finish
START Ex #2(tool,grit,sf,condition)
Finish
STOP/FINISH #2 (note: Successful?)
Finish
START Ex #3(tool,grit,sf,condition)
Finish
STOP/FINISH #3 (note: Successful?)
Finish
START Ex #4(tool,grit,sf,condition)
Finish
STOP/FINISH #4 (note: Successful?)
Finish
START Ex #5(tool,grit,sf,condition)
Finish
STOP/FINISH #5 (note: Successful?)
Finish
Resinous Coating Application
Task Description Task Notes Performed By Completion Date
Take off any nice clothes (company sweaters, collared shirt...)
Finish
Check Spiked Shoes for loose spikes
Finish
Assign Roles & Responsibilities to Everyone (List them here)
Finish
Rehearse! and go over the plan IN DETAIL
Finish
When everyone is gloved up and FULLY ready. Only then begin to mix.
Finish
Complete Timing Experiment (success?)
Finish
Clean tools ASAP(roller, squeegee, mix paddle, drill, sprayers!)
Finish
Make sure no material leaks/spills anywhere
Finish
Put up a sign indicating drytime & inform owner.
Finish
Barricade the space from pedestrians/animals/people/debris
Finish
Coordinate w/ schedule manager on drytime & next work schedule.
Finish
Apply 2nd Resinous Coating.
Task Description Task Notes Performed By Completion Date
Sand all parts that have roughness/bubbles
Finish
Inspect that floor is fully prepped/Sanded
Finish
Vacuum floor TWICE over (2 dif. people)
Finish
Windows open + Fans going for acetone scrub
Finish
Microfiber floor with small splashes of Acetone (DONT BLOW UP)
Finish
Inspect Jobsite (who inspected)
Finish
Inspect Mix Station:(Gloves,rags,xylene,chorded drill,garbage bags)
Finish
Do a second walk through inspection
Finish
Remind people to remember timing exp. start/stop
Finish
Assign Roles & Responsibilities to Everyone (List them here)
Finish
Read Application Ins. in TDS outloud if ANYONE<5 jobs w/this coatings
Finish
Rehearse! and go over the plan IN DETAIL. (Aluminum Oxide??)
Finish
Setup Timing Experiment (note: conditions, # people, tools, etc.)
Finish
When everyone is gloved up and FULLY ready. Only then begin to mix.
Finish
Complete Timing Experiment (success?)
Finish
Clean tools ASAP, but remember floor comes first! Clean within earshot
Finish
Check all tools are clean(roller, squeegee, mix paddle, drill, sprayers!)
Finish
Make sure no material leaks/spills anywhere
Finish
Put up a sign indicating drytime & inform owner.
Finish
Barricade the space from pedestrians/animals/people/debris
Finish
Coordinate w/ schedule manager on drytime & next work schedule.
Finish
Apply Resinous Clear Coat
Task Description Task Notes Performed By Completion Date
Sand all parts that have roughness/bubbles
Finish
Inspect that floor is fully prepped/Sanded
Finish
Vacuum floor TWICE over (2 dif. people)
Finish
Windows open + Fans going for acetone scrub
Finish
Microfiber floor with small splashes of Acetone (DONT BLOW UP)
Finish
Inspect Jobsite (who inspected)
Finish
Inspect Mix Station:(Gloves,rags,xylene,chorded drill,garbage bags)
Finish
Do a second walk through inspection
Finish
Remind people to remember timing exp. start/stop
Finish
Assign Roles & Responsibilities to Everyone (List them here)
Finish
Read Application Ins. in TDS outloud if ANYONE<5 jobs w/this coatings
Finish
Rehearse! Go over plan IN DETAIL & Dont Forget the Aluminum Oxide!!
Finish
Setup Timing Experiment (note: conditions, # people, tools, etc.)
Finish
When everyone is gloved up and FULLY ready. Only then begin to mix.
Finish
Complete Timing Experiment (success?)
Finish
Clean tools ASAP, but remember floor comes first!
Finish
Make sure no material leaks/spills anywhere
Finish
Put up a sign indicating drytime & inform owner.
Finish
Barricade the space from pedestrians/animals/people/debris
Finish
Finish Job
Task Description Task Notes Performed By Completion Date
Cleanup Jobsite & put away tools
Finish
Take pics of jobsite
Finish
Chk site (tools/trash/stains)
Finish
2nd jobsite inspection(other person)
Finish
Secure work area with tape/sign
Finish
Leave customers keys
Finish
Everyone clock out?
Finish
Tasks
Restock Quantity Tool Bin Restock
3" wool buffing wheel - 3 inch, Wool, Equipment
-
=
3" wool buffing wheel - 5 inch, Microfiber, Equipment
-
=
Epoxy Coatings - Red, Supplies and Materials
-
=
Epoxy Coatings - Yellow, Supplies and Materials
-
=
Diamond (100 grit) Transitional 3in - 100-150
-
=
Diamond (100 grit) Transitional 3in - 400
-
=
60 grit husky diamond metal bond soft - 50-80, Equipment, Metal, Husky
-
=
60 grit husky diamond metal bond soft - 30-40, Equipment, Metal, Husky
-
=
60 grit husky diamond metal bond soft - 100-150, Equipment, Metal, Husky
-
=
9" paint roller 3/8in napp
-
=
4in 3/8" napp roller
-
=
200 grit resin husky 3in velcro - 200, Equipment, Transitional, Husky, 3 inch, Medium
-
=
3 Inch Resin - 400, Equipment, Resin, Generic, 3 inch, Medium
-
=
3 Inch Resin - 800, Equipment, Resin, Generic, 3 inch, Medium
-
=
Prosoco Int. Dye - Amber bottles
-
=
Prosoco Int. Dye - Antique Cork bottles
-
=
Prosoco Int. Dye - Black bottles
-
=
Prosoco Int. Dye - Blue Stone bottles
-
=
Prosoco Int. Dye - Bronze bottles
-
=
Endurable Stain - Orange Crush bottles
-
=
Endurable Stain - Orchid bottles
-
=
Endurable Stain - Pacific bottles
-
=
Endurable Stain - Padre bottles
-
=
Endurable Stain - Storm Cloud bottles
-
=
Endurable Stain - Topaz bottles
-
=
APF - Epoxy 450 - Part A - 100 Percent Solids gallons
-
=
APF - Epoxy 450 Part B - 100 Percent Solids gallons
-
=
Polyaspartic Pure - Spartacote - Part B gallons
-
=
Polyaspartic Pure - Spartacote - Part A gallons
-
=
Husky Hard 120 Double - 100-150, Equipment, Metal, Husky, Double Button, Hard
-
=
Bit - Husky, Hard, 14-25, Metal, Double Button, Equipment
-
=
Bit - Husky, Hard, 14-25, Metal, Double Button, Equipment
-
=
Bits - Husky, Hard, 30-40, Metal, Double Button, Equipment
-
=
Bits - Husky, Hard, 30-40, Metal, Single Button, Equipment
-
=
Bits - Scanmaskin, Hard, 100-150, Metal, Double Button, Equipment
-
=
Bit - Scanmaskin, Hard, 100-150, Metal, Double Button, Equipment
-
=
bits - Scanmaskin, Hard, 14-25, Metal, Single Button, Equipment
-
=
bit - Scanmaskin, Hard, 30-40, Metal, Double Button, Equipment
-
=
bit - Scanmaskin, Hard, 30-40, Metal, Single Button, Equipment
-
=
bits - Scanmaskin, Hard, 50-80, Metal, Double Button, Equipment
-
=
bits - Scanmaskin, Hard, 50-80, Metal, Single Button, Equipment
-
=
bits - Scanmaskin, Medium, 100-150, Metal, Double Button, Equipment
-
=
bits - Scanmaskin, Medium, 14-25, Metal, Double Button, Equipment
-
=
bits - Scanmaskin, Medium, 14-25, Metal, Single Button, Equipment
-
=
Paint Roller - 9 inch, 3/8 inch, Equipment
-
=
Paint Roller - 4 inch, 3/8 inch, Equipment
-
=
Paint Roller - 18 inch, 3/8 inch, Equipment
-
=
Paint Roller - 9 inch, 3/4 inch, Equipment
-
=
Cup Wheel - Generic, Medium, 100-150, Transitional, 5 inch, Equipment
-
=
Cup Wheel - Generic, Medium, 50-80, Transitional, 5 inch, Equipment
-
=